How to Prepare Your Site for Porta Potty Delivery
A porta potty delivery goes fast when the spot is flat, the truck path is clear, gates are open and someone answers the driver's call. Most delays come from locked gates, low wires and soft ground. Use this checklist the day before delivery.
What does the driver need?
The driver needs a flat, firm spot at least 4 by 4 feet, a clear path at least 48 inches wide, the gate code and a phone number that will answer. For a restroom trailer, the driver also needs a level pad, an outlet and room to back in.
- A flat, firm spot. Concrete, gravel or packed dirt works. Soft sand and slopes do not.
- A clear path for the truck. Tell us about narrow side yards, steep driveways and low wires or branches.
- Gate codes and lock combos in the order notes, plus a site contact phone.
- Door facing away from afternoon sun and wind when you can. We will suggest the spot.
- For a restroom trailer: a level pad, a 110-volt outlet and a water spigot within hose reach.
What slows a delivery down?
Locked gates, cars parked in the path, low wires, soft sand and missing site contacts slow deliveries most. Each one can force the driver to leave the unit at the curb or come back later. Fix them the day before and the drop takes minutes.
- Move cars and trailers out of the driveway
- Unlock gates or share the code
- Mark the exact spot with a cone or chalk
- Tell us about dogs in the yard
Where should the unit go?
Put the unit close to the people who will use it, on flat ground, out of the way of traffic and away from food. On homes, the driveway or side yard is best. On jobsites, near the staging area and easy for the service truck to reach each week.
More questions
What if the unit is placed in the wrong spot?
Call right away. If the driver is still close, the unit can often be moved the same day. Later moves are done on a service visit or as a quoted trip.